Eagle Project Day 2 9/26/17

posted Aug 19, 2018, 2:29 PM by Calendar BSATroop46Va
This was day 2 of the Eagle project benefiting Emmanuel United Methodist Church with a new sidewalk for the parsonage.

A concrete truck from DanLeeCo concrete was sent to the work site. Concrete was poured near the porch, and spread evenly and smoothly. The truck would be moved down the sidewalk, and then the process would be repeated. As the concrete was progressively poured, the edges were smoothed, and break lines were added to the concrete. A rough bristled brush was run across the concrete to add traction and texture to the sidewalk.